UNION OF INDIA v. SH. AB. SHAH AND ORS.
vidhipandit.com/case/sc-s-1996-2-620-630
Machine-read from a scanned report. Check the printed page before citing. Report an error.
Headnote — Supreme Court Reports (editorial summary, not part of the judgment)
Allowing the appeal, this Court
Held
1. The conditions 3 & 6 imposed for depillaring are not only relatable but the unstowing required for the length must exist always, 11 disobedience of which shall become continuing offence". So even if other conditions are held to be falling under completed offence, violation of condition Nos. 3 & 6 cannot be so treated as to invoke the time limit prescribed under Section 79 of the Mines Act 1952. The charge framed is not barred by limitation. In view of the above conclusion, the plea taken by Respondent Nos. 1 to 4 that they were not the concerned officers when the offence was detected, will not hold water. The preliminary objections raised by them cannot be sustained. [630-A-C) G State of Bihar v. Dev Karan, AIR (1973) SC 908, relied on.
Reporter's headnote (continued) and case details
A
MAY 9, 1996
B
Mines Act, 1952-Sections 73, 79, Explanation (a)-Coal Mines Regulations 1957-Regulation No. 100(1)-Conditions imposed for depil/ar- ing-To be obeyed always-Othenvise a continuing offence-Held, action in- C itiated subsequently is not bmTed by limitation.
Words and Phrase~"At any time"-Explained as "at any point of time".
The Respondent-Oriental Coal Co. Ltd. through their agent obtained permission from the D.G., Mines Safety on 2.1.1971 to split pillars in conjunction with hydraulic sand stowing in No. 1 seam in the area. The conditions 5 & 6 imposed for the same were modified on 14.6.1971, at the instance of the agent. The Coal Mines was taken over by the Central • Government and vested in the Coal Mines Authority on 9.8.1973. On an inspection by the Dy. Director of Mines on 2.4.1974, certain violations were found and the agent was called upon to explain the violation. Though a reply was received from the agent, no explanation was received from Respondent No. 1 On a further inspection on 26.8.1975 the Dy. Director found that the violation was continuing. As the concerned persons had not compiled with the conditions subject to which the splitting of pillars in conjunction with hydraulic sand §towing was granted, the Inspector filed F a complaint in the Court of First Class Judicial Magistrate, alleging contravention of the conditions of permission. Respondents 1 to 4 raised two preliminary objections viz., that the complaint was barred by limita- tion prescribed under Section 79 of the Act and that in any case respondent Nos. 1 to 4 were not in management of the coal mines in question when the alleged offence was alleged to have been committed and therefore they could not be criminally proceeded with. The trial court accepted the contentions and acquitted Respondents 1 to 4.
On appeal, the High Court confirmed the acquittal accepting the same contentions. The High Court held that the breach of any of the conditions imposed for depillaring by itself is not punishable since the 620
U.O.L "·AB. SHAH 621 grant of permission on 2.l.1971'was not an "order" made under the Act of A 1952, that stowing with sand is intended as an integral part of the opera- tion of splitting pillars and that the words "at any time" contained in Condition No. 6 necessarily imply during the operation of the splitting and therefore the ofi'ence is not a continuing one as it is completed as soon as splitting or depillaring is. commenced or conducted or carried out in breach of any of the conditions on which permission to depillar was granted.
In appeal to this Court, it was contended by Appellant that the trial court as well as the High court grossly erred in not accepting the conten- tion that the offence committed by the Respondents being continuing,in nature falling under explanation (a) to Section 79 of the Mines Act, 1952, the complaint was not barred by time, that the High Court having rightly noted that out of lll conditions non-compliance of condition Nos. 3 and 6 would fall under "continuing offence", fell into error in holding that all the conditions must be read conjunctively and not disjunctively, and that if the offence is a "continuing offence" falling under Explanation (a) to D Section 79 of the Act then notwithstanding the fact that Respondents No. 1 to 4 were not in office when the offence was first detected, they are answerable to the charges levelled against them.
2. The conditions 3 and 6 are not only relatable to what was required at the commencement of depillaring process but the unsto\\ing for the required length must exist always. In this context, the expression "at any H
p. 622
A time11 mentioned in condition No. 6, has to mean, in the context in which it has been used, "at any point of time" the effect of which is that the required length must be maintained all the time. [629-D-E]
Lucknow Development Autho1ity v. M.K. Gupta, [1994] 1 SCC 243, referred to. B Black's Law Dictionary, Stroud's "Judicial Dictionmy" Vol. I IV Edn. Pg. 145 to 153, referred to.
CRIMINAL APPELLATE JURISDICTION : Criminal Appeal No. 463 of 1983. c From the Judgment and Order dated 28.8.81 of the Bombay High Court in Cr!. A. No. 24 of 1981.
Tara Chandra Sharma, C.V. Subba Rao and Ms. Niranjana Singh for the appellant. D L.K. Pandey for the Respondent Nos. 1-4.
S.M. Jadhav and D.M. Nargolakar, for the Respon\ient No. 5.
Judgment
The Judgment of the Court was delivered by : E K. VENKATASWAMI, J. Aggrieved by the judgment in Criminal Appeal no. 24/81 dated 26.8.1988 on the file of Bombay High Court (Nagpur Bench), this appeal is filed by special leave.
The appellant preferred a complaint under section 73 of the Mines F Act 1952 (hereinafter referred to as "the Act") read with Regulation No. 100(1) of the Coal Mines Regulations 1957 (hereinafter referred to as "the Regulation"). The facts leading to the filing of this Appeal may be stated in brief to appreciate the contentions raised before us. The facts are as under:
G Kamptee Colliery originally was owned by the. Oriental Coal Com- pany Limited. At the instance of the agent of Oriental Coal Company Limited, the Director General of Mines safety granted permission on 2.1.1971 under Regulation 100(1) of the Regulations to split pillars in conjunction with hydraulic sand stowing in No. 1 seem in the area. Later H on, the agent of the Oriental Coal Company Limited applied for certain
U.0.1. v. AB. SHAH [K. VENKATASWAMI, J.] 623
modifications in conditions Nos. 5 and 6 which was granted on 14.6.1971. A Subsequently, on 30.1.1973, the possession of the coal mines was taken over by the Central Government and the ownership of the said coal mines vested in the Coal Mines Authority on 9.8.1973. The Deputy Director of Mines at Nagpur made an inspection oh 2.4.1974 and found that the sizes of split galleries were about 8.2 metres. It was in violation of condition No. 1 B imposed by the Director of Mines Safety. The agent was called upon to explain the violation by the Joint Director of Mines Safety by his letter dated 30.4.1974. A reply was sent on 13.5.1974. Explanation was called for from respondent No. 1 on 10.8.1974. No reply was received, inspite of several reminders. The Deputy Director of Mines Safety again inspected the mines in question on 26.8,1975, along with the agent, and found the violation of condition No. 1 continuing and also found that the adjacent galleries were not kept stowed of the pillar where splitting had commenced. After the taking over of mines as mentioned above, the coal mine in question formed part of the Western Coal Fields Limited. As the con- cerned persons had not complied with the conditions subject to which the splitting of pillars in conjunction with hydraulic sand stowing was granted, the Inspector (now, Deputy Director of Mines) filed a complaint in the · Court of Judicial Magistrate, first Class, Ramtak, Nagpur, alleging con- travention of the conditions of permission The Trial court framed charges accordingly to which respondent Nos. 1 to 4 pleaded not guilty and claimed to be tried. Two principal contentions were advanced in defence before the Trial Court. They were that the complaint was barred by limitation prescribed under Section .79 of the Act and in any ease, respondent Nos. 1 to 4 were not in management of the coal mines in question when the alleged offence was alleged to have been committed and, therefore, they could not be criminally proceeded against.
The learned Trial Judge accepted both the contentions of respondent Nos. 1 to 4 and consequently acquitted them. On appeal preferred by the appellant, the High Court also confirmed the acquittal accepting the same contentions. Hence the present appeal. G
Before dealing with the question of law that arises for our considera- tion, we want to express our anguish that we did not get the required assistance in this case. The appellant except filing the judgment of the High Court and the grounds for special leave did not take any step, inspite of H
p. 624
A passing of 13 years, to file other important relevant pa.pers to help the Court in deciding the issue, i.e. the judgment of the Trial Court, the charge sheet filed in the Trial Court, the evidence-both oral and documentary, reply given by the agent for the initial notice etc. They are all required to fully appreciate the issue raised before us. The further agony is that inspite B of notices served on the respondents, none appeared before us to answer the contentions raised in this Appeal. In this state of affairs, we have decided the issue on the basis of the typed judgment of the High Court which alone is made available, apart from the grounds in the special leave petition.
c The learned counsel appearing for the appellant submitted that the Trial Court as well as the High Court grossly erred in not accepting the contention put forward on behalf of the complainant/appellant that the offence committed by the respondents being 'continuing' in nature falling under Explanation (a) to Section 79 of the Act, the complaint was not D barred by time. He also submitted that the High Court having rightly noted that out of 10 conditions, non-compliance of condition Nos. 3 and 6 would fall under 'continuing offence', fell into an error in holding that all the conditions must be read conjunctively and not disjunctively. If the offence is a 'continuing offence' falling under Explanation (a) to Section 79 o~ the E Act, then notwithstanding the fact that respondent Nos. 1 to 4 were not in office when the offence was first detected, they are answerable to the charges levelled against them.
We have perused the judgment of the High Court. Before going to the actual question, it is necessary to set out the conditions subject to which F the permission was granted. As the document was not typed and produced before us, we arc setting out the relevant portion from the judgment of the High Court which reads as follows :
"By the letter ex. 27 dated 2nd January 1971, the Director G General of Mines Safety granted to the Agent of the Messrs. Oriental Coal Company Limited, Kamptee Colliery "permission under regulation 100(1) of the Coal Mines Regulations, 1957 to split pillars in conjunction with hydraulic sand stowing in No. 1 seam in the area indicated in plan No. I Dep/15/70 dated 26.6.70 H at Kamptee Colliery" subject to the following conditions :
p. 625
11. Each pillar shall be divided into four equal stooks by central dip A and level splits. For different depths, the maximum and minimum dimensions of galleries and stooks respectively shall be as follows:
For depth Gallery which Stooks shall not exceeding shall not exceed be less than B 60 metres 5.4·metres 5 mts. x 5 mts. 90 metres 5.4 metres 6.6 mts. x 6.6 mts. 120 metres 5.4 metres 9 mts. x 9 mts. 153 metres 4.8 metres 10.5 mts. x 10.5 mts.
22. The final height of original and split galleries shall not c exceed 3.6 meters.
33. After splitting is completed all original and split galleries shall be stowed solid with sand. D
44. Not more than two pillars shall be under splitting at any time in a panel.
55. A pillar shall not be split unless all original and split galleries on the inby~ side have been fully stowed. E
66. Not more than a total length of 45 metres of split shall be left unstowed at any time in a whole panel. (Emphasis added)
77. Before starting splitting of pillars in a panel, it shall be insolated by stoppings in compliance with the provisions of regula- tion 100(4) of the Coal Mines Regulation, 1957, and an intimation F to that effect shall be sent to this Directorate and the Joint Director of Mines Safety. These stopping shall be constructed to the specifications laid down in this Directorate Circular No. 17of1964 as modified by Circular No. 1 of 1968. G
88. No splitting or reduction of pillars shall be done beneath and in the vicinity of dwelling/building or public road, if any, likely to be affected by the splitting operations.
99. In the event of any change in the circumstances connected with this splitting permission, which is likely to affect the safety of H
p. 626
A the \Vork persons or the mine or the surface features, an intimation shall be sent immediately to this Directorate and the Joint Director of Mines, Safety and splitting operations shall be stopped. The splitting of pillars shall not be resumed, except with permission in writing from the Director General of Mines Safety.
1010. The above permission may be amended or withdrawn at any time, if considered necessary.
By letter ex. 28 dated 8th April 1971, the Agent of the Oriental Coal Company, Kamptec Colliery applied to the Director Genera.I of Mines Safety, for certain modifications in conditions No. 5 and c 6 of the above conditions and by the letter Ex. 31 dated 14.6.1971 the Director General of Mines, Safety accepted the proposal and modified these conditions. These modified conditions were as follows :
D Condition No. 5:
A pillar shall not be completely split unless all original and split galleries on the inbye side have been fully stowed. (i.e. the word "completely" was added) and
E Condition No. 6:
Not more than 150 metres of split galleries shall be left un- stowed at anytime in the whole panel. (i.e. the figure" 150 metres" was substituted for the original words "45 metres").
F It is seen from the judgment of the High Court that it accepted that violation uf condition Nos. 3 and 6 would constitute 'continuing offence' in the light of Sections 73 and 79 of the Act read with Regulation 100 of the Regulations. The High Court however held as follows :
"Here, Shri Bobde for the respondents Nos. 1 to 4 very rightly pointed out that the gist of the offence alleged under Section 73 of the Mines Act, 1952 in the present case is 'dipillaring' in breach of the conditions contained in Ex. 27 dated 2.1. 1971 and not the breach of the said conditions themselves. Analysing the provisions of Section 73 of the Mines Act, 1952, it was pointed out that the section contemplates 3 categories of contraventions made punish·
• U.0.1. v. A.B. SHAH [K VENKATASWAMI, J.] 627
able thereunder : A (a) Contravention of any provisions of the Mines Act, 1952, or
(b) Contravention of any regulation, rule or bye-law made under the Mines Act, 1952 (i.e. subordinate legislation), or B ( c) contravention of any order made under any provisions of the Mines Act, 1952 or under any regulation, rule or bye-law made under the Mines Act, 1952 (i.e. contravention of order made under any subordinate legislation under the Mines Act, 1952).
The ,present was not a case falling under the category (a) or c (c) above. There was no order made in writing as would come \vithin the ambit of category (c). The permission Ex. 27 dated 2.1.1971 was not an "order" made under the Mines Act, 1952 or under the provisions of any subordinate legislation thereunder. Shri Bobde pointed out instances of provisions for making of such orders by reference to section 22 and 72(b) of the Mines Act, 1952 and to Regulations Nos. 65, 101, 103 and 128 of the Coal Mines Regulations 1957. Shri Bobde is entirely right in these contentions. The gist of the offence alleged in the present case is "depillaring" in contravention of the conditions in Ex. 27 dated 2.1.1971 9n which permission to depillar was granted. Breach of any of these condi- tions by itself is not punishable under Section 73 of the Mines Act, 1952."
The High Court further held in paragraph 12 as under : F "Here Shri Bobde vety rightly pointed out that the ten conditions contained in the letter Ex. 27 dated 2.1.71 have to be read together as a whole and not one or two of them separately and in isolation without the context. These ten are the composite conditions on which permission lo depillar is granted. Shri Bobde drew my attention to the title mentioned at the subject of the letter Ex. 27 G dated 2.1.71 which in essence is "permission - to split pillars in conjunction with hydraulic sand stowing -" stowing with sand is, therefore, intended as an integral part of the operation of splitting pillars, i.e. depillaring and does not stand on its own independent basis. Shri Bobde pointed out that there is no revision in the Mines H
p. 628
A Act, 1952 or the Coal Mines Regulations 1957 under which the running of a mine with a failure to stow after depillaring is itself made an offence. The charge in the present case is in respect of breach of regulation 100(1), the subject of which is "Depillaring operation", in essence the t:harge is "Depillaring or splitting in 1 ' 11 11
breach of the conditions on which permission to split pillars was B granted vide letter Ex. 27 dated 2.1.1971."
So far as condition No. 6 is concerned, the High Court held as follows:
!!Therefore the \VOrds uat any time 11 contained in condition No. c 6" not more than 150 metres of split galleries shall be left unstowed at any time in the whole panel'' necessarily imply "during the operation of splitting", and are not indicative of a state of continuity in the mines year after the splitting is completed, as a continuing contravention punishable under Section 73 of the Mines Act, 1952, D read with Regulation 100(1) of the Coal Mines Regulations 1957. The offence is, therefore, not a continuing one, it is completed as soon as splitting or depillaring is conunenced or conducted or carried out in breach of any of the conditions on which permission to depillar was granted." E Now; the issue is whether the High Court was right in coming to the conclusion that the offence was not a 'continuing offence' on the main ground that all the conditions must be read together.
In State of Bihar v. Dev Karan, AIR (1973) SC 908 this Court had the occasion to consider the meaning of 'continuing offence' falling under Explanation (a) to Section 79 of the Act. This Court held as follows in para 5:
"Continuing offence is one which is susceptible of continuance and is distinguishable from the one which is committed once and for all. It is one of those offences which arise out of a failure to obey or comply with a rule or its requirement and which involve a penalty, the liability for which continues until the rule or its requirement is obeyed or complied with. On evory occasion that such disobedience or non-compliance occurs and recurs there is the offence committed. The distinction between the two kinds of
U.0.l. v.AB.SHAH[K.VENKATASWAM!,J.] 629
offences is between an act or omission which constitutes an offence once and for all and an act or omission which continues and therefore constitutes a fresh offence every time or occasion on which it continues. In the case of a continuing offence, there is thus the ingredient of continuance of the offence which is absent in the case of an offence which takes place when an act or omission is committed once and for all."
Bearing the above principle in mind, we have to find out whether the offence committed. by the respondents, in particular violation of conditions Nos. 3 and 6, could be treated as 'continuing offence' or completed offence. To appreciate this, we must also bear in mind the object and purpose of c the Act. This we can get from the long title which reads "An act to amend and consolidate the law relating to the regulation of labour and safely in n1ines. 11
If we look into condition Nos. 3 and 6 with the object and purpose D of the Act in mind, it has to be held that these conditions are not only relatab1e to what was required at the commencement of dcpillaring of process, but the unstowing for the required length must exist always. The expression "at any time" ~inding place in condition No. 6 has to mean, in the context in which it has been used, "at any point of time", the effect of which is that the required length must be maintained all the time. The E accomplishment of object of the Act, one of which is safety in the mines, requires taking of such a view, especially in the backdrop of repeated mine disasters which have been taking, off and on, heavy toll of lives of the miners. It may be pointed out that the word "any" has a diversity of meaning and in Black's 'Law Dictionary' it has been stated that this word may be employed to indicate "all11 or 11 every11 , and its meaning will depend 11 upon the context and subject matter of the statute". A reference to what has been stated in Stroud's 'Judicial Dictionary' Vol. I, is revealing inasmuch as the import of the word "any" has been explained from pages 145 to 153 of the 4th Edition, a perusal of which shows it has different connotations depending primarily on the subject matter of the statute and the context of its use. A Bench of this Court in Lucknow Development Authority v. M.K. Gupta, [1994] 1 SCC 243, gave a very wide meaning to this word finding place in the section 2( o) of the Consumers Protection Act, 1986 defining "service". (See para 4).
We, therefore, hold that the aforesaid conditions have to be obeyed H
p. 630
A always, disobedience of which shall become "continuing offence," in the light of what has been stated in the decision of Dev Karan (supra). So, even if other conditions are held to be falling; under completed offence, violation of condition Nos. J and 6 cannot be so treated as to invoke the time limit prescribed under Section 79 of the Act. Therefore, we are inclined to differ from the view taken by the High Court and hold that violation of conditions B Nos. 3 and 6 are 'continuing offences' and the charge framed is not barred by limitation. Once this conclusion is reached, the plea taken by respondent Nos. 1 to 4 that they were not the concerned officers when the offence was detected, will not hold water. Consequently, the preliminary objection raised by the respondent Nos. 1 to 4 cannot be sustained. c The appeal is therefore, allowed. The matter is remanded to the Trial Court for disposal on merits in accordance with law.
V.M. Appeal allowed.
Report an error in this judgment →
Contains information from the Indian High Court / Supreme Court Judgments dataset, licensed under CC-BY-4.0