FAIZABAD-AYODHYA DEVELOPMENT AUTHORITY, FAIZABAD v. DR. RAJESH KUMAR PANDEY & ORS.
Tools
- Court
- Supreme Court of India
- Decided
- Bench
- M. R. SHAH and B. V. NAGARATHNA
- Citation
- [2022] 3 S.C.R. 190
Source PDF (original scan)
Contains information from the Indian High Court / Supreme Court Judgments dataset, licensed under CC-BY-4.0
Machine-read from a scanned report. Check the printed page before citing. Report an error.
A State Government is demanding from the appellants is the price of the minor minerals. Rent, royalty or tax has already been recovered by the State Government and, therefore, there is no demand under that head. No penal proceedings, much less any criminal proceedings, have been initiated against the appellants. It is absolutely incorrect to contend that the appellants are being B asked to pay any penalty or are being subjected to any penal action. It is not the case of the appellants that they are being asked to pay the price more than what they have realised from the exports or that the price appointed by the respondent State is in any manner arbitrary or unreasonable.” C (emphasis supplied)
326. In A.R. Antulay [A.R. Antulay v. R.S. Nayak, (1988) 2 SCC 602], this Court observed that it is a settled principle that an act of the court shall prejudice no man. This maxim actus curiae neminem gravabit is founded upon justice and good sense and D affords a safe and certain guide for the administration of the law. No man can be denied his rights. In India, a delay occurs due to procedural wrangles. In A.R. Antulay [A.R. Antulay v. R.S. Nayak, (1988) 2 SCC 602], this Court observed: (SCC p. 687, para 102) E “102. This being the apex court, no litigant has any opportunity of approaching any higher forum to question its decisions. Lord Buckmaster in Montreal Street Railway Co. v. Normandin [1917 AC 170 (PC)] (sic) stated: ‘All rules of court are nothing but provisions intended to F secure the proper administration of justice. It is, therefore, essential that they should be made to serve and be subordinate to that purpose.’ This Court in State of Gujarat v. Ramprakash P. Puri [(1969) 3 SCC 156], reiterated the position by saying: (SCC p. 159, G para 5) ‘5. … Procedure has been described to be a handmaid and not a mistress of law, intended to subserve and facilitate the cause of justice and not to govern or obstruct it. Like all rules of procedure, this rule demands a construction which would promote this cause.’
FAIZABAD-AYODHYA DEVELOPMENT AUTHORITY, FAIZABAD v. 233 DR. RAJESH KUMAR PANDEY [M. R. SHAH, J.]
Footnotes
329. There can be no doubt that when parties are before court, the final decision has to prevail, and they succeed or fail based on the merits of their relative cases. Neither can be permitted to take shelter under the cover of court’s order to put the other party in a disadvantageous position. If one has enjoyed under the court’s cover, that period cannot be included towards inaction of the authorities to take requisite steps under Section 24. The State authorities would have acted but for the court’s order. In fact, the occasion for the petitioners to approach the court in those cases, was that the State or acquiring bodies were taking their properties. Ultimately case had to stand on its merit in the challenge to the acquisition or compensation, and no right or advantage could therefore be conferred (or accrue) under Section 24(2) in such situations. G X X X X
334. For all these reasons, it is held that the omission to expressly enact a provision, that excludes the period during which any interim order was operative, preventing the State from taking possession H
p. 234
A of acquired land, or from giving effect to the award, in a particular case or cases, cannot result in the inclusion of such period or periods for the purpose of reckoning the period of 5 years. Also, merely because timelines are indicated, with the consequence of lapsing, under Sections 19 and 69 of the 2013 Act, per se does not mean that omission to factor such time (of subsistence of interim B orders) has any special legislative intent. This Court notices, in this context, that even under the new Act (nor was it so under the 1894 Act) no provision has been enacted, for lapse of the entire acquisition, for non-payment of compensation within a specified time; nor has any such provision been made regarding possession. C Furthermore, non-compliance with payment and deposit provisions (under Section 77) only results in higher interest pay-outs under Section 80. The omission to provide for exclusion of time during which interim orders subsisted, while determining whether or not acquisitions lapsed, in the present case, is a clear result of inadvertence or accident, having regard to the subject-matter, D refusal to apply the principle underlying the maxim actus curiae neminem gravabit would result in injustice.” 11.2 While applying the principle of restitution, it is observed in paragraphs 335 to 339 as under:- E “In re : Principle of restitution
335. The principle of restitution is founded on the ideal of doing complete justice at the end of litigation, and parties have to be placed in the same position but for the litigation and interim order, if any, passed in the matter. In South Eastern Coalfields F Ltd. v. State of M.P. [(2003) 8 SCC 648], it was held that no party could take advantage of litigation. It has to disgorge the advantage gained due to delay in case lis is lost. The interim order passed by the court merges into a final decision. The validity of an interim order, passed in favour of a party, stands reversed in the event of a final order going against the party successful at the interim stage. Section 144 of the Code of Civil Procedure is not the fountain source of restitution. It is rather a statutory recognition of the rule of justice, equity and fair play. The court has inherent jurisdiction to order restitution so as to do complete justice. This is also on the principle that a wrong order should not be perpetuated by keeping it alive and respecting it. In exercise of such power,
FAIZABAD-AYODHYA DEVELOPMENT AUTHORITY, FAIZABAD v. 235 DR. RAJESH KUMAR PANDEY [M. R. SHAH, J.]
the courts have applied the principle of restitution to myriad situations not falling within the terms of Section 144 CPC. What attracts applicability of restitution is not the act of the court being wrongful or mistake or an error committed by the court; the test is whether, on account of an act of the party persuading the court to pass an order held at the end as not sustainable, resulting in one party gaining an advantage which it would not have otherwise earned, or the other party having suffered an impoverishment, restitution has to be made. Litigation cannot be permitted to be a productive industry. Litigation cannot be reduced to gaming where there is an element of chance in every case. If the concept of restitution is excluded from application to interim orders, then the litigant would stand to gain by swallowing the benefits yielding out of the interim order. This Court observed in South Eastern Coalfields [South Eastern Coalfields Ltd. v. State of M.P., (2003) 8 SCC 648] thus: (SCC pp. 662-64, paras 26-28) “26. In our opinion, the principle of restitution takes care of this submission. The word “restitution” in its etymological sense means restoring to a party on the modification, variation or reversal of a decree or order, what has been lost to him in execution of decree or order of the court or in direct consequence of a decree or order (see Zafar Khan v. Board of Revenue, U.P. [1984 Supp SCC 505]). In law, the term E “restitution” is used in three senses : (i) return or restoration of some specific thing to its rightful owner or status; (ii) compensation for benefits derived from a wrong done to another; and (iii) compensation or reparation for the loss caused to another. (See Black’s Law Dictionary, 7th Edn., p. F 1315). The Law of Contracts by John D. Calamari & Joseph M. Perillo has been quoted by Black to say that “restitution” is an ambiguous term, sometimes referring to the disgorging of something which has been taken and at times referring to compensation for the injury done: G ‘Often, the result under either meaning of the term would be the same. … Unjust impoverishment, as well as unjust enrichment, is a ground for restitution. If the defendant is guilty of a non-tortious misrepresentation, the measure of recovery is not rigid but, as in other cases of restitution, H
p. 236
A such factors as relative fault, the agreed-upon risks, and the fairness of alternative risk allocations not agreed upon and not attributable to the fault of either party need to be weighed.’ The principle of restitution has been statutorily recognised in Section B 144 of the Code of Civil Procedure, 1908. Section 144 CPC speaks not only of a decree being varied, reversed, set aside or modified but also includes an order on a par with a decree. The scope of the provision is wide enough so as to include therein almost all the kinds of variation, reversal, setting aside or modification of a decree or order. The interim order passed by the court merges into a final C decision. The validity of an interim order, passed in favour of a party, stands reversed in the event of a final decision going against the party successful at the interim stage. …
27. … This is also on the principle that a wrong order should not be perpetuated by keeping it alive and respecting it (A. Arunagiri D Nadar v. S.P. Rathinasami [1970 SCC OnLine Mad 63]). In the exercise of such inherent power, the courts have applied the principles of restitution to myriad situations not strictly falling within the terms of Section 144.
28. That no one shall suffer by an act of the court is not a rule confined to an erroneous act of the court; the “act of the court” embraces within its sweep all such acts as to which the court may form an opinion in any legal proceedings that the court would not have so acted had it been correctly apprised of the facts and the law. … the concept of restitution is excluded from application to interim orders, then the litigant would stand to gain by swallowing the benefits yielding out of the interim order even though the battle has been lost at the end. This cannot be countenanced. We are, therefore, of the opinion that the successful party finally held entitled to a relief assessable in terms of money at the end of the litigation, is entitled to be compensated by award of interest at a suitable reasonable rate for the period for which the interim order of the court withholding the release of money had remained in operation.” (emphasis supplied)
FAIZABAD-AYODHYA DEVELOPMENT AUTHORITY, FAIZABAD v. 237 DR. RAJESH KUMAR PANDEY [M. R. SHAH, J.]
336. In State of Gujarat v. Essar Oil Ltd. [(2012) 3 SCC 522], A it was observed that the principle of restitution is a remedy against unjust enrichment or unjust benefit. The Court observed: (SCC p. 542, paras 61-62) “61. The concept of restitution is virtually a common law principle, and it is a remedy against unjust enrichment or unjust benefit. The core of the concept lies in the conscience of the court, which prevents a party from retaining money or some benefit derived from another, which it has received by way of an erroneous decree of the court. Such remedy in English Law is generally different from a remedy in contract or in tort and falls within the third category of common law remedy, which is called quasi-contract or restitution.
62. If we analyse the concept of restitution, one thing emerges clearly that the obligation to restitute lies on the person or the authority that has received unjust enrichment or unjust benefit (see Halsbury’s Laws of England, 4th Edn., Vol. 9, p. 434).” D
Footnotes
171. In Ram Krishna Verma v. State of U.P. [(1992) 2 SCC 620] this Court observed as under: (SCC p. 630, para 16) H
p. 238
A “16. The 50 operators, including the appellants/private operators, have been running their stage carriages by blatant abuse of the process of the court by delaying the hearing as directed in Jeewan Nath Wahal case [Jeewan Nath Wahal v. State of U.P., (2011) 12 SCC 769] and the High Court earlier thereto. As a fact, on the expiry of the initial B period of the grant after 29-9-1959, they lost the right to obtain renewal or to ply their vehicles, as this Court declared the scheme to be operative. However, by sheer abuse of the process of law, they are continuing to ply their vehicles pending the hearing of the objections. This Court C in Grindlays Bank Ltd. v. CIT [(1980) 2 SCC 191] held that the High Court, while exercising its power under Article 226, the interest of justice requires that any undeserved or unfair advantage gained by a party invoking the jurisdiction of the court must be neutralised. It was further held that the institution of the litigation by it should not be permitted to confer an unfair advantage on the party responsible for it. In the light of that law and in view of the power under Article 142(1) of the Constitution this Court, while exercising its jurisdiction would do complete justice and neutralise the unfair advantage gained by the 50 operators including the appellants in dragging the litigation to run the stage carriages on the approved route or area or portion thereof and forfeited their right to hearing of the objections filed by them to the draft scheme dated 26-2-1959.”
172. This Court in Kavita Trehan v. Balsara Hygiene Products F Ltd. [(1994) 5 SCC 380] observed as under: (SCC p. 391, para 22) “22. The jurisdiction to make restitution is inherent in every court and will be exercised whenever the justice of the case demands. It will be exercised under inherent powers, where the case did not strictly fall within the ambit of Section 144. Section 144 opens with the words: ‘144. Application for restitution.—(1) Where and insofar as a decree or an order is varied or reversed in any appeal, revision or other proceeding or is set aside or modified in any suit instituted for the purpose,….’
FAIZABAD-AYODHYA DEVELOPMENT AUTHORITY, FAIZABAD v. 239 DR. RAJESH KUMAR PANDEY [M. R. SHAH, J.]
The instant case may not strictly fall within the terms of Section A 144, but the aggrieved party in such a case can appeal to the larger and general powers of restitution inherent in every court.”
173. This Court in Marshall Sons & Co. (India) Ltd. v. Sahi Oretrans (P) Ltd. [(1999) 2 SCC 325] observed as under: (SCC pp. 326-27, para 4) B “4. From the narration of the facts, though it appears to us, prima facie, that a decree in favour of the appellant is not being executed for some reason or the other, we do not think it proper at this stage to direct the respondent to deliver the possession to the appellant since the suit filed by the respondent is still pending. It is true that proceedings are dragged on for a long time on one count or the other and, on occasion, become highly technical accompanied by unending prolixity at every stage, providing a legal trap to the unwary. Because of the delay, unscrupulous parties to the proceedings take undue advantage, and the person who is in wrongful possession draws delight in delay in disposal of the cases by taking undue advantage of procedural complications. It is also a known fact that after obtaining a decree for possession of the immovable property, its execution takes a long time. In such a situation, for protecting the interest of the judgment-creditor, it is necessary to pass appropriate orders so that reasonable mesne profit which may be equivalent to the market rent is paid by a person who is holding over the property. In appropriate cases, the court may appoint a Receiver and direct the person who is holding over the property to act as an agent of the [Receiver with a direction to deposit the royalty amount fixed by the] F Receiver or pass such other order which may meet the interest of justice. This may prevent further injury to the plaintiff in whose favour the decree is passed and to protect the property, including further alienation.”
174. In Padmawati v. Harijan Sewak Sangh [2008 SCC OnLine G Del 1202] decided by the Delhi High Court on 6-11-2008, the Court held as under: (SCC Online Del para 6) “6. The case at hand shows that frivolous defences and frivolous litigation is a calculated venture involving no risks situation. H
p. 240
A You have only to engage professionals to prolong the litigation so as to deprive the rights of a person and enjoy the fruits of illegalities. I consider that in such cases where the court finds that using the courts as a tool, a litigant has perpetuated illegalities or has perpetuated an illegal possession, the court must impose costs on such litigants which should be equal to the benefits derived by the litigant and harm and deprivation suffered by the rightful person so as to check the frivolous litigation and prevent the people from reaping a rich harvest of illegal acts through the courts. One of the aims of every judicial system has to be to discourage unjust enrichment using courts as a tool. The costs imposed by the courts must in all cases should be the real costs equal to deprivation suffered by the rightful person.” We approve the findings of the High Court of Delhi in the case mentioned above.
D 175. The High Court also stated: (Padmawati case [Padmawati v. Harijan Sewak Sangh, 2008 SCC OnLine Del 1202], SCC OnLine Del para 9) “9. Before parting with this case, we consider it necessary to observe that one of the [main] reasons for overflowing of court dockets is the frivolous litigation in which the courts are engaged by the litigants and which is dragged on for as long as possible. Even if these litigants ultimately lose the lis, they become the real victors and have the last laugh. This class of people who perpetuate illegal acts by obtaining stays and injunctions from the courts must be made to pay the sufferer not only the entire illegal gains made by them as costs to the person deprived of his right but also must be burdened with exemplary costs. The faith of people in judiciary can only be sustained if the persons on the right side of the law do not feel that even if they keep fighting for justice in the court and ultimately win, they would turn out to be a fool since winning a case after 20 or 30 years would make the wrongdoer as real gainer, who had reaped the benefits for all those years. Thus, it becomes the duty of the courts to see that such wrongdoers are discouraged at every step, and even if they succeed in prolonging the litigation due to their money power, ultimately, they must suffer the costs of
FAIZABAD-AYODHYA DEVELOPMENT AUTHORITY, FAIZABAD v. 241 DR. RAJESH KUMAR PANDEY [M. R. SHAH, J.]
all these years’ long litigation. Despite the settled legal positions, the obvious wrongdoers, use one after another tier of judicial review mechanism as a gamble, knowing fully well that dice is always loaded in their favour since even if they lose, the time gained is the real gain. This situation must be redeemed by the courts.” B
176. Against this judgment of the Delhi High Court, Special Leave to Appeal (Civil) No. 29197 of 2008 was preferred to this Court. The Court passed the following order [Padmawati v. Harijan Sewak Sangh, (2012) 6 SCC 460]: (SCC p. 460, para 1) “1. We have heard the learned counsel appearing for the C parties. We find no ground to interfere with the well-considered judgment passed by the High Court. The special leave petition is, accordingly, dismissed.” ***
183. In Marshall Sons & Co. (India) Ltd. v. Sahi Oretrans (P) D Ltd. [(1999) 2 SCC 325] this Court in para 4 of the judgment observed as under: (SCC pp. 326-27) “4. … It is true that proceedings are dragged on for a long time on one count or the other and, on occasion, become highly technical accompanied by unending prolixity at every stage, providing a legal trap to the unwary. Because of the delay, unscrupulous parties to the proceedings take undue advantage, and a person who is in wrongful possession draws delight in delay in disposal of the cases by taking undue advantage of procedural complications. It is also a known fact that after obtaining a decree for possession of immovable property, its execution takes a long time. In such a situation, for protecting the interest of the judgment-creditor, it is necessary to pass appropriate orders so that reasonable mesne profit which may be equivalent to the market rent is paid by a person who is holding over the property. In appropriate cases, the court may appoint a Receiver and direct the person who is holding over the property to act as an agent of the Receiver with a direction to deposit the royalty amount fixed by the Receiver or pass such other order which may meet the interest of justice. This may prevent further injury to the plaintiff in whose favour the H
p. 242
A decree is passed and to protect the property, including further alienation.”
184. In Ouseph Mathai v. M. Abdul Khadir [(2002) 1 SCC 319] this Court reiterated the legal position that: (SCC p. 328, para 13) “13. … [the] stay granted by the court does not confer a right upon a party and it is granted always subject to the final result of the matter in the court and at the risks and costs of the party obtaining the stay. After the dismissal, of the lis, the party concerned is relegated to the position which existed prior to the filing of the petition in the court which had granted the stay. Grant of stay does not automatically amount to extension of a statutory protection.” ’ ” There are other decisions as well, which iterate and apply the same principle. [Indian Council for Enviro-Legal Action v. Union of India, (2011) 8 SCC 161; Grindlays Bank D Ltd. v. CIT, (1980) 2 SCC 191; Ram Krishna Verma v. State of U.P., (1992) 2 SCC 620. Also Marshall Sons & Co. (India) Ltd. v. Sahi Oretrans (P) Ltd., (1999) 2 SCC 325.]
338. A wrongdoer or in the present context, a litigant who takes his chances, cannot be permitted to gain by delaying tactics. It is the duty of the judicial system to discourage undue enrichment or drawing of undue advantage, by using the court as a tool. In Kalabharati Advertising v. Hemant Vimalnath Narichania [(2010) 9 SCC 437], it was observed that courts should be careful in neutralizing the effect of consequential orders passed pursuant to interim orders. Such directions are necessary to check the rising trend among the litigants to secure reliefs as an interim measure and avoid adjudication of the case on merits. Thus, the restitutionary principle recognizes and gives shape to the idea that advantages secured by a litigant, on account of orders of court, at his behest, should not be perpetuated; this would encourage the prolific or serial litigant, to approach courts time and again and defeat rights of others — including undermining of public purposes underlying acquisition proceedings. A different approach would mean that, for instance, where two landowners (sought to be displaced from their lands by the same notification) are awarded compensation, of whom one allows the issue to attain finality — H
FAIZABAD-AYODHYA DEVELOPMENT AUTHORITY, FAIZABAD v. 243 DR. RAJESH KUMAR PANDEY [M. R. SHAH, J.]
and moves on, the other obdurately seeks to stall the public purpose A underlying the acquisition, by filing one or series of litigation, during the pendency of which interim orders might inure and bind the parties, the latter would profit and be rewarded, with the deemed lapse condition under Section 24(2). Such a consequence, in the opinion of this Court, was never intended by Parliament; B furthermore, the restitutionary principle requires that the advantage gained by the litigant should be suitably offset, in favour of the other party.
339. In Krishnaswamy S. Pd. v. Union of India [(2006) 3 SCC 286], it was observed that an unintentional mistake of the Court, which may prejudice the cause of any party, must and alone could be rectified. Thus, in our opinion, the period for which the interim order has operated under Section 24 has to be excluded for counting the period of 5 years under Section 24(2) for the various reasons mentioned above.”
12. The sum and substance of the aforesaid observations could be summarized as under:- (i) The time of five years is provided to the authorities to take action, not to sleep over the matter; (ii) Only in cases of lethargy or inaction and default on the part of the authorities and for no other reason lapse of acquisition can occur; (iii) Lapse of acquisition takes place only in case of default by the authorities acquiring the land, not caused by any other reason or order of the court; F (iv) The additional compensation @ 12% provided under Section 69 of the Act, 2013 has been excluded from the period acquisition proceedings have been held up on account of the interim injunction order of any court; (v) If it was not possible for the acquiring authorities, for any G reason not attributable to them or the Government, to take requisite steps, the period has to be excluded; (vi) In case the authorities are prevented by the court’s order, obviously, as per the interpretation of the provisions such period has to be excluded; H
p. 244
A (vii) The intent of the Act, 2013 is not to benefit landowners only. The provisions of Section 24 by itself do not intend to confer benefits on litigating parties as such, while as per Section 114 of the Act, 2013 and Section 6 of the General Clauses Act the case has to be litigated as per the provisions of the Act, 1894. (viii) It is not the intendment of the Act, 2013 that those who have assailed the acquisition process should get benefits of higher compensation as contemplated under Section 24; (ix) It is not intended by the provisions that in case, the persons, who have litigated and have obtained interim orders from the Civil Courts by filing suits or from the High Court under Article 226 of the Constitution should have the benefits of the provisions of the Act, 2013 except to the extent specifically provided under the Act, 2013; D (x) In cases where some landowners have chosen to take recourse to litigation and have obtained interim orders restraining taking of possession or orders of status quo, as a matter of practical reality it is not possible for the authorities or the Government to take possession or to make payment E of compensation to the landowners. In several instances, such interim orders also have impeded the making of an award; (xi) However, so far as awards are concerned, the period provided for making of awards under the Act, 2013 (sic 1894 F Act) could be excluded by virtue of Explanation to Section 11-A, which provided that in computing the period of two years, the period during which any action or proceeding to be taken in pursuance of the declaration is stayed by an order of a court shall be excluded; G (xii) The litigation initiated by the landowners has to be decided on its own merits and the benefits of Section 24(2) should not be available to the litigants in a straightjacket manner. In case there is no interim order, they can get the benefits they are entitled to, not otherwise. Delays and dilatory tactics H
FAIZABAD-AYODHYA DEVELOPMENT AUTHORITY, FAIZABAD v. 245 DR. RAJESH KUMAR PANDEY [M. R. SHAH, J.]
and sometimes wholly frivolous pleas cannot result in A benefitting the landowners under sub-section (1) of Section 24 of the Act, 2013; (xiii) Any type of order passed by this Court would inhibit action on the part of the authorities to proceed further, when a challenge to acquisition is pending; B (xiv) Interim order of stay granted in one of the matters of the landowners would cause a complete restraint on the authorities to proceed further to issue declaration; (xv) When the authorities are disabled from performing duties due to impossibility, it would be a sufficient excuse for them C to save them from rigour of provisions of Section 24. A litigant may have a good or a bad cause, be right or wrong. But he cannot be permitted to take advantage of a situation created by him by way of an interim order passed in his favour by the Court at his instance. Although provision of D Section 24 does not discriminate between landowners, who are litigants or non-litigants and treat them differently with respect to the same acquisition, it is necessary to view all of them from the stand point of the intention of the Parliament. Otherwise, anomalous results may occur and provisions may become discriminatory in itself; E
(xvi) The law does not expect the performance of the impossible; (xvii) An act of the court shall prejudice no man; (xviii) A party prevented from doing an act by certain circumstances beyond his control can do so at the first subsequent opportunity; (xix) When there is a disability to perform a part of the law, such a charge has to be excused. When performance of the formalities prescribed by a statute is rendered impossible by circumstances over which the persons concerned have no control, it has to be taken as a valid excuse; (xx) The Court can under its inherent jurisdiction ex debito justitiae has a duty to mitigate the damage suffered by the defendants by the act of the Court; H
p. 246
A (xxi) No person can suffer from the act of Court and an unfair advantage of the interim order must be neutralised; (xxii) No party can be permitted to take shelter under the cover of Court’s order to put the other party in a disadvantageous position; B (xxiii) If one has enjoyed under the Court’s cover, that period cannot be included towards inaction of the authorities to take requisite steps under Section 24 as the State authorities would have acted and passed an award determining compensation but for the Court’s order.
1313. Repelling the submission that there is no express provision in Section 24, that excludes the period during which any interim order was operative, preventing the State from making an award, it is observed and held that preventing the State from taking the possession of acquired land or from giving effect to the award, in a particular case or cases, cannot result in the inclusion of such period or periods for the purpose of reckoning the period of five years.
1414. The aforesaid observations would be aptly applicable while interpreting and considering Section 24(1) of the Act, 2013. In other words, whether due to the interim stay granted by the Court and the authority not declaring the award under Section 11 of the Act, 1894 and the interim stay being continued at the time when the Act, 2013 came to be enforced, such litigants, who have benefitted from the interim order can be permitted to take the advantage of the same and thereafter pray that in such a situation, they shall be paid compensation as per the new Act, 2013? It cannot be disputed that there shall be a very huge difference between the quantum of compensation payable under the Act, 1894 and the compensation payable under the Act, 2013. It cannot be said that there was any inaction on the part of the Authority in not declaring the award because of the interim order passed by the Court. Therefore, should the State and the Public Exchequer be made to suffer when there is no inaction on the part of the Authority in declaring the Award? The intention of the Parliament while enacting Section 24(1) of the Act, 2013 cannot be to give benefit to a litigant, who has obtained a stay order and because of that the award could not be declared and thereafter the litigant may be awarded the compensation as per Act, 2013. It may even result in discrimination between the landowners, whose lands have H
FAIZABAD-AYODHYA DEVELOPMENT AUTHORITY, FAIZABAD v. 247 DR. RAJESH KUMAR PANDEY [M. R. SHAH, J.]
been acquired under the same notification. Take an example, as in the present case, in Civil Appeal No. 2915 of 2022, the total land measuring 17.172 hectares was acquired from different landowners including the three plots owned by the respondents herein. The respondents herein alone were granted the interim order and because of that, the award could not be declared with respect to three plots only and with respect to the remaining lands under the same notification, the awards were declared and the payment of compensation was made under the Act, 1894. Therefore, if respondents herein, who litigated and obtained the stay order are now to be paid the compensation under the Act, 2013 on the ground that so far as they are concerned, the award has not been declared as on the date on which the Act, 2013 has been enforced, in that case, there would be two different amounts of compensation with respect to the landowners under the same notification and that would lead to discrimination amongst the landowners whose lands have been acquired under the same notification, which would never have been the intention of the Parliament. D
1515. In the case of Indore Development Authority (supra), even this Court applied the principle of restitution. It is observed that the principle of restitution is founded on the ideal of doing complete justice at the end of litigation, and parties have to be placed in the same position but for the litigation and interim order, if any, passed in the matter. Applying the principle of restitution, it is further observed that no party could take advantage of a litigation. It is further observed and held that the principle of restitution is a statutory recognition of the rule of justice, equity and fair play. The court has inherent jurisdiction to order restitution so as to do complete justice. This is also on the principle that an unsuccessful litigant who had the benefit of an interim order in his favour cannot encash or take advantage of the same on the enforcement of the Act, 2013 by initially stalling the acquisition process and later seeking a higher compensation under the provisions of Act, 2013. We say so for the reason that if at the instance of a landowner, who has challenged the acquisition, an interim order has been passed by a Court is successful then the proceeding of acquisition or the acquisition notification would be quashed. G Then there would be no occasion to determine any compensation. But on the other hand, if a landowner, who has the benefit of an interim order in his favour whilst a challenge is made to the acquisition, is unsuccessful, he cannot then contend that he must be paid compensation under the provision of the Act, 2013 on its enforcement, whereas a H
p. 248
Footnotes
1616. Therefore, even applying the principle of restitution, as applied by this Court in the case of Indore Development Authority (supra), D the landowners cannot be permitted to take advantage of the interim order obtained by them due to which the Authority could not declare the award under Section 11 of the Act, 1894 and thereafter contend that in that view of the matter, he/they shall be paid the compensation under Section 24(1) of the Act, 2013, under which a higher compensation will E be available to them on determination of the compensation under the Act, 2013. Conclusion:-
1717. In view of the above and for the reasons stated above, it is observed as under:- F (i) It is concluded and held that in a case where on the date of commencement of Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013, no award has been declared under Section 11 of the Act, 1894, due to the pendency of any proceedings and/or the interim stay granted by the Court, such landowners shall not be entitled to the compensation under Section 24(1) of the Act, 2013 and they shall be entitled to the compensation only under the Act, 1894.
1818. In view of the above discussion and for the reasons stated above and in view of our conclusion above, all these appeals are allowed.
FAIZABAD-AYODHYA DEVELOPMENT AUTHORITY, FAIZABAD v. 249 DR. RAJESH KUMAR PANDEY [M. R. SHAH, J.]
The impugned judgment(s) and order(s) passed by the High Court are quashed and set aside. The concerned appropriate Authority(s) to declare the award under Section 11 of the Act, 1894 with respect to the lands in question and determine the compensation under the provisions of the Act, 1894 by taking into consideration Section 114 of the Act, 2013 read with Section 6 of the General Clauses Act, 1897, wherever applicable and the original landowners shall be paid the compensation accordingly, under the provisions of the Act, 1894. It goes without saying that if the landowners are aggrieved by the determination of compensation declared under the award under the Act, 1894, it will be open for them to take recourse to law for enhancement of compensation under the provisions of the Land Acquisition Act, 1894 C only. With this, the present appeals are allowed. However, in the facts and circumstances of the case, there shall be no order as to costs.
D Bibhuti Bhushan Bose Appeals allowed.